Who promises to pay?
Advice authenticates and communicates; confirmation adds an undertaking; negotiation involves purchase.
Revisit lesson →Study documentary credits through guided explanations, worked document cases and practice with answer reasoning. Keep the rulebook beside you and learn to explain each decision.
16 guided lessons with plain-English explanations, Bangla clarification and worked conclusions. Start with foundations, then examine documents and test your decisions. All case facts and figures are hypothetical.
Reading progress and practice results are stored on this device.
“Marked read” records reading only. Practice scores reflect your latest checked answers, not exam certification.
Learning goal: Distinguish advice, nomination and confirmation before deciding who owes payment.
Begin with the credit itself: identify the applicant, beneficiary, issuing bank, availability and incorporated rules. UCP 600 applies through express incorporation. Its provisions can be modified or excluded by the credit, so a rule remembered in isolation is not enough.
The issuer gives the credit undertaking. A confirming bank adds its own undertaking when it actually adds confirmation. An advising bank checks apparent authenticity and accurately conveys the credit; advice alone does not create an undertaking to pay. Nomination authorizes a bank to act but does not by itself require a non-confirming nominated bank to honour or negotiate.
Honour covers sight payment, deferred payment and acceptance according to the availability. Negotiation means purchase through advancing or agreeing to advance funds under a complying presentation; merely checking and forwarding documents is not negotiation.
Advising, nomination ও confirmation এক নয়। প্রথমে নির্ধারণ করুন কোন ব্যাংক payment undertaking দিয়েছে।
An LC names Bank B as nominated bank. Bank B advises it without confirmation and only forwards documents. The beneficiary calls this negotiation.
Common mistake: A bank appearing in the LC is not automatically a confirming bank.
Rule reference: UCP 600 Articles 1, 2, 7, 8, 9, 12 · Google Drive PDF reference
Learning goal: Explain why a commercial complaint is different from a documentary discrepancy.
The sales contract and the credit are separate transactions. A bank tests the presentation against the credit, applicable UCP provisions and international standard banking practice. It does not inspect the goods to establish documentary compliance.
This separation protects a beneficiary from an applicant withholding credit payment solely because of a sales dispute. It also means a compliant document set is not a guarantee of goods quality. Fraud, sanctions and mandatory law require their own controls; documentary autonomy is not permission to ignore them.
Build a discrepancy around a stated credit requirement and the relevant document data. An applicant’s complaint or a different commercial expectation is not, by itself, that evidence.
পণ্যের বিরোধ আর documents-এর discrepancy আলাদা। LC-র শর্ত ও উপস্থাপিত documents মিলিয়ে সিদ্ধান্ত নিতে হবে।
The applicant emails that a machine is faulty. The stipulated inspection certificate and other documents comply on their face. No court order, fraud finding or sanctions issue is assumed.
Common mistake: Do not convert a buyer’s dissatisfaction into an invented discrepancy.
Rule reference: UCP 600 Articles 4, 5, 14 · Google Drive PDF reference
Learning goal: Separate shipment, presentation and expiry deadlines.
Latest shipment controls shipment timing. A presentation period controls how long after shipment the relevant documents may be presented. Expiry is another limit at the required place. Passing one test does not excuse failing another.
Under Article 3, shipment “on or about” a date permits the five calendar days before and after that date, with both boundaries included. “To”, “until”, “till”, “from” and “between” used for a shipment period include the stated dates; “before” and “after” exclude them. For a maturity date, “from” and “after” exclude the stated date. Read the context before counting.
Article 29 may extend expiry or the last day for presentation when the bank is closed for a reason other than Article 36. It does not extend the latest shipment date. A bank need not accept presentation outside its banking hours.
Shipment date, presentation period ও expiry আলাদা সীমা। একটি ঠিক থাকলেই অন্যটি ঠিক হয়ে যায় না।
The credit calls for shipment on or about 15 June. The bill of lading shows shipment on 21 June.
Common mistake: Never count banking days where the rule calls for calendar days.
Rule reference: UCP 600 Articles 3, 6, 14, 29, 33 · Google Drive PDF reference
Learning goal: Build one effective set of credit terms before examining documents.
The issuing bank is bound when it issues an amendment. For the beneficiary, the existing terms remain in force until acceptance is communicated, or a qualifying presentation establishes acceptance under Article 10(c). These are different points in time.
A beneficiary cannot take the favourable part of one amendment and reject the unfavourable part. Partial acceptance is treated as rejection. A clause saying an amendment automatically becomes effective unless rejected within a specified period is disregarded.
Confirmation must be checked separately: a confirming bank may advise an amendment without extending confirmation, provided it makes the required notifications. Maintain an amendment register showing acceptance and confirmation status, not only the message receipt date.
এক amendment-এর সুবিধাজনক অংশ গ্রহণ করে বাকি অংশ বাদ দেওয়া যায় না। Beneficiary acceptance ও confirmation আলাদাভাবে দেখুন।
One amendment increases the amount and shortens the latest shipment date. The beneficiary accepts only the amount increase.
Common mistake: Receipt of an amendment does not by itself establish beneficiary acceptance.
Rule reference: UCP 600 Articles 10 · Google Drive PDF reference
Learning goal: Calculate presentation and examination limits without mixing the two.
Each relevant bank has a maximum of five banking days following the day of presentation to determine compliance. The presentation day is not day one. Count the banking days at the place where the relevant act is performed, using that bank’s actual operating calendar.
For presentations containing original transport documents covered by Articles 19–25, the default is presentation within 21 calendar days after shipment and no later than expiry, unless the credit modifies the rule. This is a presenter’s deadline, not the bank’s examination period.
A timely presentation is not deprived of its examination period because expiry occurs during examination. Conversely, five banking days for examination do not cure a presentation made after the permissible deadline.
২১ calendar days হলো presentation-এর সীমা; পাঁচ banking days হলো bank examination-এর সময়। দুটো এক নয়।
Documents are presented on Monday. For this hypothetical bank, Monday–Friday are banking days and there are no holidays. The credit expires on Tuesday.
Common mistake: Do not assume every bank has the same weekend or holiday calendar.
Rule reference: UCP 600 Articles 14, 16 · Google Drive PDF reference
Learning goal: Apply document-specific tests instead of demanding identical wording.
Article 14(d) requires contextual consistency, not identical data everywhere. An abbreviation, a general description or a different layout is not automatically a discrepancy. Identify what the difference means before deciding.
The invoice has its own description requirement: it must correspond with the credit. Other stipulated documents may use a general goods description that does not conflict. This is why a packing list and invoice should not be examined under an identical description test.
Under Article 14(j), applicant and beneficiary addresses generally need to remain in the respective countries stated in the credit. The transport-document consignee or notify-party exception requires the applicant’s address and contact details to be as stated. Read the exception before dismissing a difference.
শব্দে শব্দে এক হওয়া জরুরি নয়; তথ্য পরস্পর বিরোধী কি না এবং document-specific rule কী—সেটিই মূল পরীক্ষা।
The credit and invoice describe “Model AX-200 industrial pump”. The packing list says “industrial pump”, with no conflicting model elsewhere.
Common mistake: A short description and an inconsistent description are not the same thing.
Rule reference: UCP 600 Articles 14, 18 · Google Drive PDF reference
Learning goal: Check issuer, addressee, currency, description and drawing amount.
Ordinarily the invoice must appear issued by the beneficiary, be made out to the applicant and use the credit currency. Article 38 supplies exceptions for transferred credits. An invoice does not need a signature under UCP alone, but an express signed-invoice requirement must still be met.
An invoice amount above the permitted credit amount is not the same as an excessive drawing. Article 18(b) permits a relevant bank to accept an excess-value invoice provided honour or negotiation does not exceed what the credit permits. That is discretion, not an automatic obligation.
Compare goods descriptions, quantity, unit price and permitted tolerances together. Do not check the total in isolation or assume a quantity tolerance also increases the amount available.
Invoice value ও amount drawn আলাদা। UCP-তে signature না লাগলেও LC-তে signed invoice চাইলে তা মানতে হবে।
An LC for USD 50,000 calls for a commercial invoice, without a signature condition. An unsigned beneficiary invoice for USD 50,000 otherwise complies.
Common mistake: A bank’s usual checklist must not add a document requirement the LC and applicable rules do not impose.
Rule reference: UCP 600 Articles 14, 18, 38 · Google Drive PDF reference
Learning goal: Identify signature capacity, shipment date and routing from actual document data.
Start by selecting the correct transport article. An ocean bill of lading under Article 20 must identify the carrier and show a permitted signature capacity. An agent’s signature must make clear whether it is for the carrier or master. The issuer’s business name alone does not establish that capacity.
A forwarder may issue a transport document if it meets the applicable article. A blanket assumption that all forwarder bills are acceptable—or all are unacceptable—misses the test. Credit wording may also impose a specific restriction.
A dated on-board notation can determine shipment date even when the issue date differs. Check the actual vessel, required ports, full set of originals, carriage terms and absence of charter-party indication. Cleanliness concerns clauses expressly declaring defective goods or packaging, not whether the word “clean” is printed.
Forwarder-এর নাম দেখে সিদ্ধান্ত নয়। Carrier, signature capacity, on-board date, ports ও originals পরীক্ষা করুন।
An otherwise compliant bill identifies Ocean Carrier Ltd and is signed “Harbour Logistics, as agent for Ocean Carrier Ltd, carrier”. It has a dated on-board notation.
Common mistake: Passing the signature test does not prove the entire bill or presentation complies.
Rule reference: UCP 600 Articles 14, 20, 27 · Google Drive PDF reference
Learning goal: Calculate required cover and distinguish issue date from effective cover.
An insurance document must appear issued and signed in a permitted insurance capacity. Identify the insurer or underwriter and, where relevant, the signing agent’s capacity. Present all originals when more than one is indicated. A cover note does not satisfy Article 28.
The insurance document should be dated no later than shipment unless it evidences cover effective no later than shipment. Therefore a later issue date is not automatically fatal: read the effective-cover evidence.
Apply the credit’s coverage requirement. If the credit gives no coverage amount, Article 28 uses at least 110% of CIF or CIP value. If that value cannot be established from the documents, apply the rule’s alternative base. Cover must use the credit currency and extend over the required route; an adequate amount alone is insufficient.
Issue date পরে হলেই insurance discrepant নয়—shipment date থেকে cover কার্যকর ছিল কি না দেখুন।
The credit requires insurance for 110% of a USD 80,000 CIF invoice. Shipment is 8 June. A certificate issued on 10 June states cover effective 8 June and provides USD 88,000.
Common mistake: “All risks” does not mean the policy contains no exclusions.
Rule reference: UCP 600 Articles 28 · Google Drive PDF reference
Learning goal: Turn findings into a complete and timely notice.
A discrepancy log is not itself a refusal notice. When refusing, the relevant bank must send the presenter one notice containing the refusal, each discrepancy relied upon and a permitted statement of what it is doing with the documents.
Make each finding specific enough to be understood: identify the document data and the requirement it fails. Avoid phrases such as “documents not in order” with no explanation. Select a document-disposition statement that matches the actual handling.
An issuing bank may approach the applicant for waiver, but that does not extend the deadline. Applicant waiver is not automatic acceptance by the bank. Failure by the issuing or confirming bank to comply with Article 16 can preclude it from claiming the presentation is non-complying.
Waiver চাইলে refusal clock থামে না। Notice-এ refusal, সব discrepancy ও documents-এর disposition থাকতে হবে।
The latest shipment date is 10 June but the B/L shows 12 June. The bank plans to refuse and hold documents pending presenter instructions.
Common mistake: Never assume the applicant’s waiver cures a late or incomplete refusal notice.
Rule reference: UCP 600 Articles 14, 16 · Google Drive PDF reference
Learning goal: Keep amount, quantity and unit-price tolerances separate.
Article 30(a) gives a 10% margin above or below the amount, quantity or unit price to which “about” or “approximately” refers. First locate the word. A quantity tolerance does not automatically become an amount tolerance.
Read express tolerance provisions and exclusions before applying the default rules. Check whether the permitted quantity and unit price can be funded within the available credit amount. A mathematically permitted quantity can still produce an excessive drawing.
Use a small three-column worksheet: quantity range, unit-price range and amount cap. This makes mismatched LC terms visible before documents arrive.
“About” যে amount, quantity বা unit price-এর সঙ্গে আছে, tolerance সেই অংশে প্রযোজ্য। সব ক্ষেত্রে একসঙ্গে নয়।
The LC permits “about 200 MT” at USD 250 per MT but caps the amount at USD 50,000 with no amount tolerance. Shipment is 220 MT at the stated unit price.
Common mistake: Do not silently add 10% to the credit amount because quantity says “about”.
Rule reference: UCP 600 Articles 30 · Google Drive PDF reference
Learning goal: Apply the conditional 5% quantity tolerance and respect the amount cap.
Article 30(b) permits a quantity variation up to 5% where the credit does not state a stipulated number of packing units or individual items, and total drawings stay within the credit amount. Express credit terms may change this.
Weight or volume quantities such as MT can fall within this rule. A stipulated number of bags, cartons or individual machines does not acquire this automatic 5% tolerance. Read how the quantity is actually expressed rather than classifying only by the commodity name.
Keep Article 30(c)’s conditional amount shortfall separate from Article 30(b)’s quantity margin. Do not use either as a blanket permission to change an expressly stated unit price or ignore a no-variation clause.
২০০ MT আর ২০০ bags এক ধরনের quantity expression নয়। ৫% quantity tolerance স্বয়ংক্রিয়ভাবে packing units-এ প্রযোজ্য নয়।
The LC specifies 200 MT at USD 250 per MT, USD 50,000 maximum, no express tolerance and no partial shipments. The invoice is for 196 MT at USD 250, total USD 49,000.
Common mistake: 5% more quantity does not authorize 5% more money.
Rule reference: UCP 600 Articles 30, 31 · Google Drive PDF reference
Learning goal: Distinguish conveyance tests from a time-bound instalment schedule.
Partial shipments and drawings are allowed unless the credit changes that position. Multiple transport-document sets do not necessarily mean a partial shipment: Article 31 examines conveyance, journey and destination.
Sets evidencing the same means of conveyance, same journey and same destination can avoid partial-shipment classification even with different shipment dates or loading points. For such a presentation, use the latest evidenced shipment date. Different conveyances within the same transport mode constitute partial shipment even if they depart the same day for the same destination.
Article 32 concerns stipulated instalments within given periods. Missing one instalment causes the credit to cease to be available for that and later instalments under that rule. Do not treat a later catch-up shipment as automatically restoring availability.
দুটি B/L মানেই partial shipment নয়। আর নির্দিষ্ট period-এর instalment মিস হলে পরের instalment-ও প্রভাবিত হতে পারে।
A credit requires one shipment in June and another in July. No June shipment occurs. The beneficiary proposes shipping both quantities in July.
Common mistake: Do not apply instalment consequences merely because an LC allows ordinary partial shipments.
Rule reference: UCP 600 Articles 31, 32 · Google Drive PDF reference
Learning goal: Identify what a transferring bank may change and who presents.
The credit must expressly state that it is transferable. Even then, the bank transfers only to the extent and in the manner it consents to. A transfer request comes from the first beneficiary; it does not create an unrestricted right to demand any form of transfer.
The transferred credit generally mirrors the original, including confirmation if any. Article 38 permits specified reductions or curtailments, including amount, unit price and certain deadlines. The insurance percentage may be increased to preserve the required monetary cover. This is not a general power to rewrite documents, goods or routing.
The first beneficiary may substitute its invoice and draft, if any, within the rules. It does not obtain a general right to substitute every document. A second beneficiary presents to the transferring bank; it cannot request an onward transfer to a subsequent beneficiary.
Transferable লেখা থাকলেও bank consent লাগে। Invoice substitution-এর অধিকার মানে সব document বদলানোর অধিকার নয়।
The original LC amount is USD 100,000 and insurance required is USD 110,000. A transfer for USD 80,000 needs the same monetary insurance cover.
Common mistake: Transfer is not a new independent back-to-back LC.
Rule reference: UCP 600 Articles 38 · Google Drive PDF reference
Learning goal: Separate entitlement to proceeds from the right to perform under the credit.
Article 39 recognizes that a beneficiary may assign proceeds it is or may become entitled to receive, subject to applicable law, even if the LC is not transferable. The assignee’s interest is in proceeds; this does not make it a second beneficiary entitled to perform under the LC.
Article 38 transfer makes credit availability accessible to a second beneficiary through the prescribed transfer process. Assignment does not replicate that process. Read the assignment document and applicable law separately rather than promising payment merely because an assignment notice exists.
The original beneficiary still needs to establish entitlement under the credit. Assignment does not make discrepant documents compliant or create proceeds where no entitlement arises.
Proceeds assignment হলো পাওনা অর্থের অধিকার হস্তান্তর; LC-তে performance বা presentation-এর অধিকার transfer নয়।
A non-transferable LC beneficiary assigns proceeds to its lender. The lender asks to replace the beneficiary and ship goods under the LC.
Common mistake: An assignment acknowledgement should not be described as an unconditional payment guarantee.
Rule reference: UCP 600 Articles 38, 39 · Google Drive PDF reference
Learning goal: Avoid treating all interruptions as an automatic deadline extension.
Routine non-banking closure and an Article 36 interruption are different. Article 29’s next-banking-day extension excludes the Article 36 situation and never extends latest shipment. Article 33 separately addresses presentation outside banking hours.
Article 35 contains an important lost-document protection: when the nominated bank determines compliance and forwards documents, the issuer or confirmer must honour or negotiate, or reimburse that nominated bank, even if documents are lost in transit between the specified banks. This is not a blanket rule for every lost package.
Articles 34 and 37 allocate specified document and instructed-party risks. They do not remove the need to examine documents properly or follow mandatory law. Identify the relevant bank, event and conditions before citing a disclaimer.
সাধারণ bank closure আর force majeure এক নয়। Lost documents-এর ক্ষেত্রেও কোন bank compliance নির্ধারণ করে পাঠিয়েছে তা জরুরি।
A nominated bank determines that a presentation complies and forwards the documents to the issuing bank. They are lost during that bank-to-bank transit.
Common mistake: Do not describe every postal loss or closure as force majeure.
Rule reference: UCP 600 Articles 29, 33, 34, 35, 36, 37 · Google Drive PDF reference
Teaching slides · Article 33 · Teaching slides · Article 34 · Teaching slides · Article 35 · Teaching slides · Article 36 · Teaching slides · Article 37
Compare the LC terms with the document extracts. Select the supported finding, then read the examination steps. These are simplified training extracts; a real presentation requires a complete examination.
Latest shipment: 10 June. Expiry: 30 June. Default UCP presentation period applies.
Issued 9 June. Dated on-board notation: 12 June.
Presentation made 29 June at the correct place, during banking hours.
UCP 600 Articles 14(c), 20(a)(ii)
100 units, industrial pump model AX-200. Commercial invoice and packing list required.
100 industrial pumps, model AX-200.
100 industrial pumps, model AX-300.
UCP 600 Articles 14(d)–(e), 18(c)
CIF invoice USD 80,000. Insurance certificate for 110% required.
On board: 8 June.
Issued 10 June; cover effective 8 June; insured amount USD 84,000; states two originals issued.
One insurance original presented.
UCP 600 Article 28(b), (e), (f)
Two established discrepancies: late shipment and missing required certificate.
We refuse to honour. Bill of lading shows shipment on 12 June against latest shipment 10 June.
Documents held pending presenter instructions. Notice not yet sent. Examination day four.
UCP 600 Article 16(b)–(d)
24 original multiple-choice questions. Each checked answer explains all options. This is topic practice, not an official CDCS question bank or a full mock exam.
Complete practice to identify topics to revisit.
Advice authenticates and communicates; confirmation adds an undertaking; negotiation involves purchase.
Revisit lesson →Ask what document requirement failed, not simply whether the buyer is satisfied.
Revisit lesson →Write three separate dates on the examination sheet: shipment limit, presentation limit, expiry.
Revisit lesson →Track issue, advice, acceptance and confirmation as separate events.
Revisit lesson →Presentation day = day zero; use the bank’s actual calendar.
Revisit lesson →Document type → relevant rule → exact data → reasoned conclusion.
Revisit lesson →Issuer, buyer, currency, corresponding description, amount—and express LC requirements.
Revisit lesson →Carrier → signing capacity → on-board evidence → ports → originals → adverse clauses.
Revisit lesson →Capacity, originals, effective date, currency, amount, route and required risks.
Revisit lesson →Decision + every discrepancy + permitted disposition + correct recipient + deadline.
Revisit lesson →Ask “10% of which stated variable?” before calculating.
Revisit lesson →Quantity expression, explicit tolerance, price, total drawing and partial-shipment terms must be read together.
Revisit lesson →Article 31: partial shipment. Article 32: stipulated time-bound instalment.
Revisit lesson →Express transferability, bank consent, permitted changes, invoice substitution, presentation to transferring bank.
Revisit lesson →Transfer concerns credit availability; assignment concerns proceeds, subject to law.
Revisit lesson →Classify the event first, then test the precise rule conditions.
Revisit lesson →15 article decks by Kazi A. B. M. Bashir Ahmed CDCS, located in your existing source collection. Open the relevant deck alongside the lesson. These are supplementary teaching materials; original files and access permissions remain unchanged.
The same source folder contains older ISBP 745 slides. They are not used as ISBP 821 authority here. The new guided lessons cite UCP provisions; use the ISBP 821 reference for document-specific practice.
These Google Drive PDF references are from the existing TradeFinanceBD source inventory. The files remain hosted in Google Drive; access and usage are governed by Drive permissions and ICC licensing. The portal does not publish a separate PDF copy.
Explore 111 original lessons covering all 39 UCP 600 articles, 15 ISBP 821 document sections, all 17 URR 725 articles and practical companion subjects. Each lesson includes a principle, operational checklist, case and self-check. References identify the source section; always consult the applicable rulebook for authoritative wording.
Loading learning topics…
Source coverage varies: UCP 600 and URR 725 article headings were checked against the supplied PDFs; ISBP 821 section names were checked against ICC’s published index because its Drive PDF is image-based; companion topics are original overviews, not verbatim ICC publications. Completion is stored only in this browser.
Study in sequence or choose a rule. Each module contains original explanations, a worked scenario and a self-check. Related collections, guarantee and digital-rule modules broaden trade practice.
UCP 600, articles 1–5, 6–10, 14–16 and 18–28
Identify applicant, beneficiary, issuing bank, advising bank and any confirming or nominated bank. Separate the sales dispute from the bank’s documentary undertaking. Read availability, expiry, place of presentation and amendment history before examining individual documents.
Build a credit-specific checklist. Review documents together for conflicts rather than demanding identical wording everywhere. Distinguish latest shipment, expiry and any presentation period. Count the examination period in banking days under the applicable rule; it is not an automatic extension of expiry.
Record each genuine discrepancy and its credit or rule basis. A refusal must meet the applicable notice requirements; seeking an applicant waiver does not suspend the deadline. Keep document disposition instructions clear.
Scenario: A buyer complains that goods are defective, but the documents appear compliant. Should the examiner reject solely on that complaint?
Approach: Separate goods performance from documentary compliance. Examine the presentation under the credit and applicable rules; escalate any distinct fraud, sanctions or legal issue through the bank’s controls.
Does an applicant’s waiver automatically compel the issuing bank to accept?
No. The issuing bank must make its own decision and meet the applicable examination and notice requirements.
ICC source / official reading ↗ · Google Drive PDF reference ↑ · Module index ↑
ISBP 821 (2023), read with UCP 600
Start with the credit and UCP, then consult the ISBP practice for the actual document: invoice, transport, insurance, origin or another certificate. ISBP explains examination practice; it does not replace the credit.
Compare names, goods, dates, amounts, routing and document function. Treat an apparent spelling variation differently from a change of party or goods identity. Record why data conflict, rather than simply marking every difference as a discrepancy.
For each concern, capture the credit requirement, document wording, applicable practice and conclusion. Separate a request for clarification from an established discrepancy.
Scenario: An invoice and packing list describe the same goods at different levels of detail. Is a discrepancy automatic?
Approach: No. Check the credit’s specific requirements and whether the descriptions conflict. Apply the relevant document-specific practice; detail alone is not the decision.
Should the same checklist be used unchanged for an air waybill and an ocean bill of lading?
No. Select the applicable transport-document rules and practices, then test that document’s required content.
ICC source / official reading ↗ · Google Drive PDF reference ↑ · Module index ↑
11 Incoterms® 2020 rules
Any-mode rules: EXW, FCA, CPT, CIP, DAP, DPU and DDP. Sea/inland-waterway rules: FAS, FOB, CFR and CIF. Write the precise named place or port and the edition into the sale contract.
A seller paying carriage does not necessarily bear transit risk until arrival. Identify the delivery point first, then allocate carriage, insurance, clearance and unloading. Incoterms do not themselves determine payment method or transfer of ownership.
Check the transport route and insurance requirement against the chosen term and the credit. CIF and CIP have different default insurance levels. FCA permits an agreed arrangement for an on-board bill of lading.
Scenario: A CFR sale suffers transit damage after loading on board. Does the seller’s payment of freight alone mean the seller retained the transit risk?
Approach: No. Cost payment and risk transfer are separate. Identify contractual delivery under CFR, then consider insurance, breach and the governing law.
Which rule explicitly includes unloading at the named destination: DAP or DPU?
DPU. Under DAP, delivery is on the arriving means of transport ready for unloading.
URC 522; collection instruction and release terms
Map principal, remitting bank, collecting bank, presenting bank and drawee. Read the collection instruction, currency, charges and document-release conditions. A collection is not the same bank payment undertaking as a documentary credit.
Under documents against payment, release follows the specified payment condition. Under documents against acceptance, release follows the specified acceptance condition; acceptance alone does not ensure payment at maturity. Identify who bears buyer and country risk.
Check instructions for non-payment, non-acceptance, protest, charges, storage and a case-of-need contact. Escalate unclear instructions before release. Do not silently turn D/P into D/A.
Scenario: The buyer asks for shipping documents now and promises payment next week under a D/P instruction. Can the presenting bank release on that promise?
Approach: Follow the collection instruction. Obtain an authorized change through the proper channel before changing the release condition.
Does a collecting bank ordinarily examine collection documents for LC-style compliance?
No. Collection handling and the relevant document checks differ from examination under a documentary credit.
URR 725 and the reimbursement authorization
Identify issuing, claiming and reimbursing banks. Distinguish a reimbursement authorization from a reimbursement undertaking.
Read incorporation, currency, amount, claim route and any undertaking. Reconcile reimbursement instructions with the credit; a funding arrangement does not replace documentary examination.
Scenario: Is naming a reimbursing bank enough to establish its independent payment undertaking?
Approach: No. Identify whether an undertaking was actually issued and its terms.
Which document should the claiming bank check before sending a reimbursement claim?
The relevant reimbursement authorization and any undertaking, alongside its own credit instructions.
ISP98; the individual standby wording
Identify the beneficiary, issuer, amount, expiry and required demand documents. Confirm the expressly incorporated rules.
Check where and how presentation must occur, the required statement and signatures, drawing limits and amendment history. Distinguish the underlying default from the documents required to claim.
Scenario: A beneficiary alleges default but omits a statement expressly required by the standby. Is the allegation alone sufficient?
Approach: No. Test the presentation against the standby and incorporated rules.
Can commercial-LC practice be copied into every standby unchanged?
No. Use the standby’s wording and applicable standby rules.
URDG 758; related ISDGP study
Map applicant, beneficiary, guarantor and any counter-guarantor. A guarantee and counter-guarantee are separate undertakings.
Identify incorporation, demand conditions, supporting statement, presentation channel, expiry and reduction provisions. Check the actual text before treating a contract dispute as a documentary conclusion.
Scenario: A counter-guarantee exists. Can its beneficiary demand directly under the separate local guarantee merely because both concern the same contract?
Approach: Do not assume interchangeable rights. Identify the beneficiary and claim requirements of each undertaking.
What should be checked first when selecting a guarantee checklist?
The undertaking’s wording and the rules it expressly incorporates.
eUCP 2.1; eURC 1.1; URDTT 1.0
Distinguish electronic presentation under a credit, electronic collection and a fully digital trade transaction. State the applicable rules and version.
Agree formats, presentation address, access and completion requirements. Check legal recognition of electronic transferable records separately from platform capability.
Scenario: A PDF is emailed to a bank. Does that alone prove a valid electronic presentation?
Approach: No. Check incorporation, agreed presentation requirements and applicable law.
Does technology capability establish legal recognition in every jurisdiction?
No. Legal recognition requires a separate jurisdiction-specific check.
Continue to the portal’s source-linked rules library alongside these modules.
Open rules library →Practise LC issuance, presentation, examination, trade settlement and controls in the AIBB subject pack.
Open subject and practice →Revise source-linked trade concepts. These quizzes are learning aids, not an official CDCS examination question bank.
Open quizzes →Study documentary credits, collections, guarantees, payment allocation and associated banking risks.
Open foundation module →Study standard: This is a structured portal reading pathway, not an official ICC examination provider or full licensed CDCS syllabus. Verify the latest CDCS syllabus and applicable UCP 600 / ISBP 821 edition with the issuing bodies.